mexicodailypost.com
7 thousand tons of basalt stone for the Maya Train project arrive in Campeche - Campeche Post
Campeche, Camp., (July 14, 2021).- The Campeche 2000 maritime terminal was the headquarters for the reception operations for seven thousand tons of basalt stone from the port of Veracruz that will be transported by nautical route for the construction of route 2 of the Maya Train. Constituted as the port with the largest dredging in the state of Campeche […]
MDP Newsroom